| August 28/11 - Working on connecting hallways - Facing northwest |
| August 28/11 - Connecting entranceway to portables - picture taken on north field facing school |
| August 28/11 - Link between portables and the school - north side of the school |
| August 28/11 - Parking lot on south east side of the school |
| August 5/11 - Fourth portable placed and blocked onsite |
| August 4/11 - Three portables placed and blocked onsite. |
| August 4/11 - North view of portables being hauled onsite. |
| August 4/11 - Portables one and two being hauled onsite. |