Modernization August 2011 
 

 Progress in Pictures August/11

ThumbnailDescriptionFilter
August 28/11 - Working on connecting hallways - Facing northwest
August 28/11 - Working on connecting hallways - Facing northwest
August 28/11 - Connecting entranceway to portables - picture taken on north field facing school
August 28/11 - Connecting entranceway to portables - picture taken on north field facing school
August 28/11 - Link between portables and the school - north side of the school
August 28/11 - Link between portables and the school - north side of the school
August 28/11 - Parking lot on south east side of the school
August 28/11 - Parking lot on south east side of the school
August 5/11 - Fourth portable placed and blocked onsite
August 5/11 - Fourth portable placed and blocked onsite
August 4/11 - Three portables placed and blocked onsite.
August 4/11 - Three portables placed and blocked onsite.
August 4/11 - North view of portables being hauled onsite.
August 4/11 - North view of portables being hauled onsite.
August 4/11 - Portables one and two being hauled onsite.
August 4/11 - Portables one and two being hauled onsite.